中考閱讀理解實戰演練之日常生活篇4
Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice (選擇) will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings (環境) near shops and bus stops, not too far from your friends and the place where you work.
Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house .He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate (預算) must be corrected and revised (修訂).His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.
When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high!) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builders estimate depends on the plan, but the final plan depends on the builders estimate.
1.The best title of this passage is ___________.
A. Building a House Costs Much Money B. Estimate Is Important
C. Planning a House D. Depend on the Builder
2.The first thing for a person to build a house is _________.
A. to get as much money as possible B. to find a suitable piece of land
C. to work out a plan D. to make an estimate
3.The phrase draw a plan in this passage means _________.
A. making a picture of a building or a room B. making a plan
C. working out a plan D. pulling a picture out of a room
4.When the builder starts to build a house, his estimate will have to be corrected and revised because _________.
A. it is wrongly worked out by a workman
B. the future owner of the house thinks the estimate is so high that he cannot afford the building.
C. The prices of building materials and the expenses (費用) of labor may be different from the original prices and expenses
D. Estimates are usually mistaken in the beginning
5.What is the relationship(關系) between the estimate and the plan?
A. The plan depends on the estimate.
B. The estimate depends on the plan.
C. The plan has nothing to do with the estimate.
D. The estimate and the plan depend on each other.
【答案與解析】
全文共三段,第一段說的是蓋房要花很多錢,首先得確定好房子的位置:向陽,地理環境優美,交通購物方便而且離自己的親朋和工作地點距離都近;第二段說的是選擇優秀的建筑工人,設計方案,繪出草圖,做好預算以及如何處理施工時可能出現的變化與預算的關系;第三段講的是建筑工所作的預算和真正施工時所發生的變更及蓋房方案與預算之間的關系。雖然全文中沒有明確的主題句,但通過對上述三段文字的分析,不難看出它們講的都圍繞著一個主題:設計一幢房子。
1.C 本小題檢測的是對整篇短文中心思想的理解能力。 A項講的是蓋一幢房子要花很多錢,這是本文的第一句話,但它只講了上述三段的蓋房子要花很多錢這一項內容,所以其概括不準確。B項是說預算是重要的,同樣犯了以偏概全的毛病。D項講的是依靠建筑工,這與短文內容是相矛盾的,故此三者皆否定之。
2.B 短文首段的第三句話:Your first step will be to find a right piece of land.(你的第一步就是選好一塊合適的地)。此句正是該題答案的出處。
3.A 解答該小題的重點是要理解好draw a plan這個短語中的關鍵詞plan。plan在本短文中反復出現了八次,第一次出現以動詞形式出現,其他七次都是名詞。作名詞用時其常見用法有二:計劃、方案;平面圖,紙張。plan 在與draw 連用時,就表明:畫一張建筑物的平面圖。B項和C項都是把plan 理解為計劃或方案了,而D項則理解成把一張圖畫從屋里找出來,這是無稽之談。由此答案非A莫屬。
4.C 本題屬細節考查題。考查的是在蓋房的施工中,最初的預算必須更正與修改的原因。短文第二段的倒數一、二句就有相對應的部分;隨后,當他開始施工時,此預算必須更改與修正。他的預算的根據是當時價格,而建筑材料與其他東西的價格在制定預算和開始施工這一階段很可能會有變化。A項說的是預算經常被施工者算錯,在短文中沒有依據;B項的未來的房主認為預算太高他支付不起在短文中也沒有依據,D項的在開始時預算往往是錯的與A項的錯誤如出一轍。
5.D 本小題考查的仍是對短文個別段落和中心意思的理解能力。短文第三段集中講的就是和建房方案之間的關系。A項只說出了建房方案對預算的依賴關系;B項只說出預算對建房方案的依賴關系,而忽略它們相互作用的一面,因此都是片面的。而C項說的是建房方案與預算毫不相干,這與短文交代的事實背道而馳,故予以排除。
Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice (選擇) will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings (環境) near shops and bus stops, not too far from your friends and the place where you work.
Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house .He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate (預算) must be corrected and revised (修訂).His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.
When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high!) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builders estimate depends on the plan, but the final plan depends on the builders estimate.
1.The best title of this passage is ___________.
A. Building a House Costs Much Money B. Estimate Is Important
C. Planning a House D. Depend on the Builder
2.The first thing for a person to build a house is _________.
A. to get as much money as possible B. to find a suitable piece of land
C. to work out a plan D. to make an estimate
3.The phrase draw a plan in this passage means _________.
A. making a picture of a building or a room B. making a plan
C. working out a plan D. pulling a picture out of a room
4.When the builder starts to build a house, his estimate will have to be corrected and revised because _________.
A. it is wrongly worked out by a workman
B. the future owner of the house thinks the estimate is so high that he cannot afford the building.
C. The prices of building materials and the expenses (費用) of labor may be different from the original prices and expenses
D. Estimates are usually mistaken in the beginning
5.What is the relationship(關系) between the estimate and the plan?
A. The plan depends on the estimate.
B. The estimate depends on the plan.
C. The plan has nothing to do with the estimate.
D. The estimate and the plan depend on each other.
【答案與解析】
全文共三段,第一段說的是蓋房要花很多錢,首先得確定好房子的位置:向陽,地理環境優美,交通購物方便而且離自己的親朋和工作地點距離都近;第二段說的是選擇優秀的建筑工人,設計方案,繪出草圖,做好預算以及如何處理施工時可能出現的變化與預算的關系;第三段講的是建筑工所作的預算和真正施工時所發生的變更及蓋房方案與預算之間的關系。雖然全文中沒有明確的主題句,但通過對上述三段文字的分析,不難看出它們講的都圍繞著一個主題:設計一幢房子。
1.C 本小題檢測的是對整篇短文中心思想的理解能力。 A項講的是蓋一幢房子要花很多錢,這是本文的第一句話,但它只講了上述三段的蓋房子要花很多錢這一項內容,所以其概括不準確。B項是說預算是重要的,同樣犯了以偏概全的毛病。D項講的是依靠建筑工,這與短文內容是相矛盾的,故此三者皆否定之。
2.B 短文首段的第三句話:Your first step will be to find a right piece of land.(你的第一步就是選好一塊合適的地)。此句正是該題答案的出處。
3.A 解答該小題的重點是要理解好draw a plan這個短語中的關鍵詞plan。plan在本短文中反復出現了八次,第一次出現以動詞形式出現,其他七次都是名詞。作名詞用時其常見用法有二:計劃、方案;平面圖,紙張。plan 在與draw 連用時,就表明:畫一張建筑物的平面圖。B項和C項都是把plan 理解為計劃或方案了,而D項則理解成把一張圖畫從屋里找出來,這是無稽之談。由此答案非A莫屬。
4.C 本題屬細節考查題。考查的是在蓋房的施工中,最初的預算必須更正與修改的原因。短文第二段的倒數一、二句就有相對應的部分;隨后,當他開始施工時,此預算必須更改與修正。他的預算的根據是當時價格,而建筑材料與其他東西的價格在制定預算和開始施工這一階段很可能會有變化。A項說的是預算經常被施工者算錯,在短文中沒有依據;B項的未來的房主認為預算太高他支付不起在短文中也沒有依據,D項的在開始時預算往往是錯的與A項的錯誤如出一轍。
5.D 本小題考查的仍是對短文個別段落和中心意思的理解能力。短文第三段集中講的就是和建房方案之間的關系。A項只說出了建房方案對預算的依賴關系;B項只說出預算對建房方案的依賴關系,而忽略它們相互作用的一面,因此都是片面的。而C項說的是建房方案與預算毫不相干,這與短文交代的事實背道而馳,故予以排除。