看雅思文章背雅思詞匯:AIRPORTS ON WATER

雕龍文庫 分享 時間: 收藏本文

看雅思文章背雅思詞匯:AIRPORTS ON WATER

  AIRPORTS ON WATER

  River deltas are difficult places for map makers. The river builds them up, the sea wears them down ; their outline s are always changing. The changes in Chinas Pearl River delta, however, are more dramatic than these natural fluctuations. An island six kilometers long and with a total area of 1248 hectares is being created there. And the civil engineers are as interested in performance as in speed and size. This is a bit of the delta that they want to endure.

  The new island of Chek Lap Kok, the site of Hong Kongs new airport, is 83% complete. The giant dumper trucks rumbling across it will have finished their job by the middle of this year and the airport itself will be built at a similarly breakneck pace.

  As Chek Lap Kok rises, however, another new Asian island is sinking back into the sea. This is a 520-hecrare island built in Osaka Bay, Japan, that serves as the platform. for the new Kansai airport. Chek Lap Kok was built in different way, and thus hopes to avoid the same sinking fate.

  The usual way to reclaim land is to pile sand rock on to the seabed. When the sealed oozes with mud, this is rather like placing a textbook on a wet sponge: the weight squeezes the water out, causing both water and sponge to settle lower. The settlement is rarely even: different parts sink at different rates. So buildings, pipes, roads and so on tend to buckle and crack. You can engineer around these problems, or you can engineer them out. Kansai took the first approach; Chek Lap Kok is taking the second.

  The differences are both political and geological. Kansai was supposed to be built just one kilometer offshore, where the seabed is quite solid. Fishermen protested, and the site was shifted a further five kilometers. That put it in deeper water and above a seabed that consisted of 20 metres of soft alluvial silt and mud deposits. Worse, below it was a not-very-firm glacial deposit hundreds of metres thick.

  The Kansai builders recognized that settlement was inevitable. Sand was driven into the seabed to strengthen it before the landfill was piled on top, in an attempt to slow the process; but this has not been as effective as had been hoped. To cope with settlement, Kansais giant terminal is supported on 900 pillars. Each of them can be individually jacked up, allowing wedges to be added underneath. That is meant to keep the building level. But it could be a tricky task.

  Conditions are different at Chek Lap Kok. There was some land there to begin with, the original little island of Chek Lap Kok and a smaller outcrop called Lam Chau. Between them, these two outcrops of hard, weathered granite make up a quarter of the new islands surface area. Unfortunately, between the islands there was a layer of soft mud, 27 metres thick in places.

  According to Frans Uiterwijk, a Dutchman who is the projects reclamation director, it would have been possible to leave this mud below the reclaimed land, and to deal with the resulting settlement by the Kansai method. But the consortium that won the contract for the island opted for a more aggressive approach, It assembled the worlds largest fleet of dredgers, which sucked up 150m cubic metres of clay and mud and dumped it in deeper waters. At the same time, sand was dredged from the waters and piled on top of the layer of stiff clay that the massive dredging had laid bare.

  Nor was the sand the only thing used. The original granite island which had hills up to 120 metres high was drilled and blasted into boulders no bigger than two metres in diameter. This provided 70m cubic metres of granite to add to the islands foundations. Because the heap of boulders does not fill the space perfectly, this represents the equivalent of 105m cubic metres of landfill. Most of the rock will become the foundations for the airports runways and its taxiways. The sand dredged from the waters will also be used to provide a two-metre capping layer over the granite platform. This makes it easier for utilities to dig trenchesgranite is unyielding stuff. Most of the terminal buildings will be placed above of pile-driving foundations above softer areas.

  The completed island will be six to seven metres above sea level. In all. 350m cubic metres of material will have been moved. And much of it, like the overloads, has to be moved several times before reaching its final resting place. For example, there has to be a motorway capable of carrying 150-tonne dump-trucks; and there has to be a raised area for the 15,000 construction workers. These are temporary; they will be removed when the airport is finished.

  The airport, though, is here to stay. To protect it, the new coastline is being bolstered with a formidable twelve kilometres of sea defenses. The brunt of a typhoon will be deflected by the neighbouring island of Lantau; the sea walls should guard against the rest. Gentler but more persistent bad weatherthe downpours of the summer monsoonis also being taken into account. A mat-like material called geo-textile is being laid across the island to separate the rock and sand layers. That will stop sand particles from being washed into the rock voids, and so causing further settlement. The island is being built never to be sunk.

  delta n.

  1.the fourth letter of the Greek alphabet希臘字母表的第四個字母。

  2.triangular area of alluvial land at a rivers mouth, enclosed or crossed by branches of the rivers.三角洲

  the Nile Delta 尼羅河三角洲

  wear sth. down: become gradually smaller, thinner, etc.使某物逐漸變小,變細,變薄等。

  outline:

  1.lines showing the shape or outer edge of sth.輪廓,外形

  She could see only the outlines of the trees in the dim light. 朦朧中,她只看到樹木的輪廓。

  2.statement of the main facts or points要點,大綱,摘要

  an outline of an essay/ a lecture

  dramatic:

  1.of drama.戲劇的

  a dramatic society 戲劇協會

  2. exciting or impressive 戲劇性的,激動人心的,給人深刻印象的

  dramatic changes, development, news 激動人心的變化,發展,資訊

  fluctuate

   n.變化,波動

  wide fluctuations of temperature. 溫度的巨大變化

  hectare

  measure of area in the metric system, equal to 100 ares or 10000 square metres. 公頃

  

  AIRPORTS ON WATER

  River deltas are difficult places for map makers. The river builds them up, the sea wears them down ; their outline s are always changing. The changes in Chinas Pearl River delta, however, are more dramatic than these natural fluctuations. An island six kilometers long and with a total area of 1248 hectares is being created there. And the civil engineers are as interested in performance as in speed and size. This is a bit of the delta that they want to endure.

  The new island of Chek Lap Kok, the site of Hong Kongs new airport, is 83% complete. The giant dumper trucks rumbling across it will have finished their job by the middle of this year and the airport itself will be built at a similarly breakneck pace.

  As Chek Lap Kok rises, however, another new Asian island is sinking back into the sea. This is a 520-hecrare island built in Osaka Bay, Japan, that serves as the platform. for the new Kansai airport. Chek Lap Kok was built in different way, and thus hopes to avoid the same sinking fate.

  The usual way to reclaim land is to pile sand rock on to the seabed. When the sealed oozes with mud, this is rather like placing a textbook on a wet sponge: the weight squeezes the water out, causing both water and sponge to settle lower. The settlement is rarely even: different parts sink at different rates. So buildings, pipes, roads and so on tend to buckle and crack. You can engineer around these problems, or you can engineer them out. Kansai took the first approach; Chek Lap Kok is taking the second.

  The differences are both political and geological. Kansai was supposed to be built just one kilometer offshore, where the seabed is quite solid. Fishermen protested, and the site was shifted a further five kilometers. That put it in deeper water and above a seabed that consisted of 20 metres of soft alluvial silt and mud deposits. Worse, below it was a not-very-firm glacial deposit hundreds of metres thick.

  The Kansai builders recognized that settlement was inevitable. Sand was driven into the seabed to strengthen it before the landfill was piled on top, in an attempt to slow the process; but this has not been as effective as had been hoped. To cope with settlement, Kansais giant terminal is supported on 900 pillars. Each of them can be individually jacked up, allowing wedges to be added underneath. That is meant to keep the building level. But it could be a tricky task.

  Conditions are different at Chek Lap Kok. There was some land there to begin with, the original little island of Chek Lap Kok and a smaller outcrop called Lam Chau. Between them, these two outcrops of hard, weathered granite make up a quarter of the new islands surface area. Unfortunately, between the islands there was a layer of soft mud, 27 metres thick in places.

  According to Frans Uiterwijk, a Dutchman who is the projects reclamation director, it would have been possible to leave this mud below the reclaimed land, and to deal with the resulting settlement by the Kansai method. But the consortium that won the contract for the island opted for a more aggressive approach, It assembled the worlds largest fleet of dredgers, which sucked up 150m cubic metres of clay and mud and dumped it in deeper waters. At the same time, sand was dredged from the waters and piled on top of the layer of stiff clay that the massive dredging had laid bare.

  Nor was the sand the only thing used. The original granite island which had hills up to 120 metres high was drilled and blasted into boulders no bigger than two metres in diameter. This provided 70m cubic metres of granite to add to the islands foundations. Because the heap of boulders does not fill the space perfectly, this represents the equivalent of 105m cubic metres of landfill. Most of the rock will become the foundations for the airports runways and its taxiways. The sand dredged from the waters will also be used to provide a two-metre capping layer over the granite platform. This makes it easier for utilities to dig trenchesgranite is unyielding stuff. Most of the terminal buildings will be placed above of pile-driving foundations above softer areas.

  The completed island will be six to seven metres above sea level. In all. 350m cubic metres of material will have been moved. And much of it, like the overloads, has to be moved several times before reaching its final resting place. For example, there has to be a motorway capable of carrying 150-tonne dump-trucks; and there has to be a raised area for the 15,000 construction workers. These are temporary; they will be removed when the airport is finished.

  The airport, though, is here to stay. To protect it, the new coastline is being bolstered with a formidable twelve kilometres of sea defenses. The brunt of a typhoon will be deflected by the neighbouring island of Lantau; the sea walls should guard against the rest. Gentler but more persistent bad weatherthe downpours of the summer monsoonis also being taken into account. A mat-like material called geo-textile is being laid across the island to separate the rock and sand layers. That will stop sand particles from being washed into the rock voids, and so causing further settlement. The island is being built never to be sunk.

  delta n.

  1.the fourth letter of the Greek alphabet希臘字母表的第四個字母。

  2.triangular area of alluvial land at a rivers mouth, enclosed or crossed by branches of the rivers.三角洲

  the Nile Delta 尼羅河三角洲

  wear sth. down: become gradually smaller, thinner, etc.使某物逐漸變小,變細,變薄等。

  outline:

  1.lines showing the shape or outer edge of sth.輪廓,外形

  She could see only the outlines of the trees in the dim light. 朦朧中,她只看到樹木的輪廓。

  2.statement of the main facts or points要點,大綱,摘要

  an outline of an essay/ a lecture

  dramatic:

  1.of drama.戲劇的

  a dramatic society 戲劇協會

  2. exciting or impressive 戲劇性的,激動人心的,給人深刻印象的

  dramatic changes, development, news 激動人心的變化,發展,資訊

  fluctuate

   n.變化,波動

  wide fluctuations of temperature. 溫度的巨大變化

  hectare

  measure of area in the metric system, equal to 100 ares or 10000 square metres. 公頃

  

主站蜘蛛池模板: 免费吃奶摸下激烈视频| 国产精品你懂的在线播放| 亚洲欧美日韩成人高清在线一区| 99热99在线| 欧美亚洲国产日韩| 国产在线19禁在线观看| 中文字幕中文字幕| 熟女性饥渴一区二区三区| 国产精品国产三级国产a| 久热免费在线视频| 色屁屁www影院免费观看视频| 宅男噜噜噜66网站| 亚洲成人网在线播放| 黑白配hd视频| 成av免费大片黄在线观看| 亚洲精品自在在线观看| 欧美另类精品xxxx人妖换性| 无遮挡呻吟娇喘视频免费播放| 免费能直接在线观看黄的视频免费欧洲毛片**老妇女 | 国产在线不卡视频| 中文字幕av免费专区| 浮力影院国产第一页| 国产成人高清亚洲一区久久| 中文字幕无码人妻aaa片| 浪荡秘书伺候办公室h| 国产成人无码精品久久久露脸| 中文字幕在线视频网站| 波多野结衣在线中文| 国产成人一区二区三区免费视频 | 天天做天天爱天天一爽一毛片| 亚洲影视一区二区| 说女生二哈是什么意思| 天天干视频在线| 久久香蕉国产线看免费| 精品国产91久久久久久久a| 国产精品午夜在线播放a| 中文字幕在线免费观看| 欧美精品偷自拍另类在线观看| 国产全黄一级毛片| 99精品视频在线观看免费专区| 日韩在线视频免费播放|